The Stainless Quotes That Go Wrong, and Why
September 25, 2026
Stainless jobs go wrong in a small number of predictable places. None of them are surprises to a shop that runs the material every week, and all of them are expensive to the shop that does not.
1. The grade is not the grade
The drawing says 17-4 PH. It does not say the condition, so it is not a specification yet. H900 and H1150 are different parts with different hardness, different corrosion resistance and different sizes after ageing.
Same problem in smaller form elsewhere: 316 without the L on a welded part, 2205 without a note about who welds it, 440C without saying which features are ground after hardening.
Before you price it: does the material callout fully determine what you have to buy and what you have to do to it? If not, that is your first question to the buyer, and it is a better question than a price.
2. The finishing was not in the RFQ
This is the big one. Passivation to ASTM A967 with a named test and a certificate, electropolishing to ASTM B912, a Ra callout on an internal surface, a bead blast for appearance. Each is a real process, most happen at a subcontractor, and all of them have a lead time you do not control.
A quote that assumed as machined and meets a part that needed citric passivation with a copper sulphate test and a lot traceable certificate is not a small correction.
Before you price it: find the finish callout on the drawing. If there is not one, ask rather than assume, particularly if the part looks like food, pharmaceutical or medical work.
3. The paperwork is real hours
Mill certificates with heat numbers, first article inspection reports, CMM reports, lot traceability, a passivation certificate with the lot number on it.
On 500 pieces this disappears into the unit price. On 5 pieces it can be a large share of the job, and it is office time rather than machine time, so it does not show up in a cycle time estimate at all.
Before you price it: list the documents the buyer asked for and price them as a line. If the RFQ does not say, ask. Buyers in regulated industries assume you know, and they are not being difficult.
4. The geometry is worse than it looks in stainless
A pocket four times deeper than it is wide, a 2 mm wall, an internal corner at R1.5, a fine thread in a blind hole, a long bore held to ±0.02 mm. Each of these is ordinary in aluminium and each is a different job in 316L, because heat stays in the part and the material hardens where a tool rubs.
Before you price it: find the worst feature and price from that, not from the part’s overall size. On stainless the worst feature usually sets the cycle time for the whole part.
5. The tolerance is on everything
A title block that says ±0.02 mm on all dimensions, on a part with forty dimensions of which four matter.
You have two options and only one of them is good. Quote it as drawn and lose to a shop that did not, or ask which features are genuinely critical. The second one takes ten minutes and it often wins the job, because most buyers did not intend the blanket note and nobody has ever pointed it out to them.
Before you price it: ask. It is also the fastest way to demonstrate that you read the drawing, which matters more to a buyer than most shops realise.
6. The quantity is not the real quantity
180 pieces once and 180 pieces quarterly justify completely different fixturing. Quote the first as if it were the second and you have given away the setup. Quote the second as if it were the first and you lose on price.
Before you price it: ask whether it repeats and how often. If the buyer does not know, price the order in front of you and say plainly what changes at volume. That sentence in a quote is worth more than a discount.
What a good stainless RFQ contains
If you take leads from any source, this is the list to judge them against. A request that carries these is worth quoting properly. A request that carries two of them is going to cost you an hour of email before you can even start.
- Grade and condition, not just the alloy family
- The environment the part lives in, in words
- Tolerances marked individually rather than a blanket note
- Surface finish with a number and a unit
- Passivation or electropolishing with the standard and the test
- Documents required back
- Quantity, and whether it repeats
- Whether the part is welded, by anyone, at any stage
That list is the same one we publish for buyers on what to put in a stainless RFQ, which is where a good part of our RFQs get their shape.
Two quick checks before any quote
Is this my work? A shop that cuts mild steel all week can machine 316L. It will just take longer, wear more tooling and discover the finishing chain on the job. Declining is cheaper than learning, and it is also the thing that makes a buyer trust you the next time.
Can I answer today? Across every channel, the shop that replies first while the buyer is still thinking about the project wins a disproportionate share. Buyers regularly tell us they sent an RFQ to four shops and heard from one. Speed is a bigger lever than price on most jobs, and it is entirely within your control.
If stainless is regular work for you, our RFQ previews carry the grade, size, quantity, tolerance, finish and the certificates the buyer asked for, and each one goes to at most three shops. Register your shop, and if you are still weighing channels, what a lead is worth has the arithmetic.
Frequently asked questions
What is the most common way a stainless quote goes wrong?
Finishing that was not in the RFQ. Passivation, electropolishing, a Ra callout or a certificate turns up after the price is agreed, and it usually lives at a subcontractor with its own price and its own queue.
Should I quote from a STEP file with no drawing?
Only with stated assumptions. A model carries geometry and nothing else: no tolerances, no finish, no material condition, no certificates. Quote it, but write the assumptions into the quote so the requote conversation is short.
How much should I add for work hardening?
Nothing, if you know the material. It should already be in your cycle time and your tooling allowance for that grade. Shops that add a percentage for stainless are usually admitting they do not have the data, and the percentage is either too high to win or too low to survive.
Need a quote for this part?
Send the drawing. We match you with up to 3 stainless shops and reply within 24 business hours.
Get matched with a stainless shopFigures in this guide are published specification limits or published typical values for the alloy, not measurements of any part. Machinability is rated against free-machining carbon steel B1112 at 100 and PREN is chromium plus 3.3 times molybdenum plus 16 times nitrogen. The conventions are set out in thereference section and the editorial standards.