How to say no to a stainless RFQ: a short reply that keeps the buyer and saves your quoting hours
November 16, 2026

Reply to every RFQ you will not quote, on the day you decide, in four lines: thank the buyer, say no, give one true reason and say what kind of job would fit. That reply costs a minute. A stainless quote costs hours of drawing review, cutting-time estimates and finishing calls, and a no-quote reply is how you stop spending those hours on jobs that will not become orders. This guide covers when to say no, which reasons stand up, three replies you can adapt and what to leave out. If you are still working out where the RFQs come from, the lead sources guide comes first.
Why a reply is worth sending
An RFP guide on no-bid letters says issuers often work to tight schedules and appreciate early notice when a vendor opts out, that ignoring a request can damage credibility with that buyer later and that a vague, generic refusal feels dismissive. The guide is written for formal proposals, not for machining RFQs, so treat it as directional. The logic carries over. A buyer who sends an RFQ is waiting on answers, and a silent shop looks the same as a shop that missed the email.
The no-quote reply also protects you. Your quoting hours are limited, and the quoting guide lists how much unseen work sits in a stainless quote: finishing, paperwork and the geometry. If you cannot win the job on grade, tolerance, certificate or schedule, the hours are better spent on a job you can.
Decide in ten minutes with a short filter
Contract review sits behind this. A summary of ISO 9001 clause 8.2.3 says an organisation should understand the customer’s requirements, including statutory and regulatory ones, and confirm it can meet them before it commits to supply. A no-quote is the result of that review when the answer is no. Keep a one-line record of why, so the decision can be repeated.
| Reason to decline | Test | What to say |
|---|---|---|
| Grade outside your experience | Have you cut this grade and held the tolerance on a similar part? | “We do not run super duplex or 904L work” or the grade in question |
| Size or envelope | Does the part fit your machines and your inspection equipment? | The envelope you can handle |
| Tolerance or measurement | Can you inspect the tightest callout with a calibrated method? | “We cannot verify this tolerance on this feature” |
| Certificate | Does the RFQ name a certificate you do not hold? | “The RFQ requires X. We do not hold it” |
| Finish | Is the passivation or electropolish spec one you can deliver or subcontract with a certificate? | The finish you offer |
| Quantity | Is the volume far above or below the sizes you run? | The range that suits you |
| Date | Can you meet the requested delivery with your current load? | A date you could meet, if any |
| Drawing status | Is the drawing marked with export control language? | See the note below |
The test column is the point. A “no” for the wrong reason, such as a part you could make with a new fixture, is a loss. A “no” because a certificate is missing is correct, and so is a “no” because the grade is one you do not cut.
Export-controlled drawings. If a drawing carries a defense export control marking, stop and check with whoever handles export compliance for you. Under the US International Traffic in Arms Regulations, administered by the State Department’s Directorate of Defense Trade Controls, manufacturers of defense articles must register, and giving a foreign person access to controlled technical data without authorisation can bring heavy penalties. A shop that is not set up for that work should decline and say so, and should not forward or discuss the drawing.
A missing detail is not a no. If the RFQ lacks the grade, quantity or tolerance, your reply is a question, not a refusal. The stainless RFQ guide lists what a complete request holds, and you can send the buyer that list.
Three replies you can adapt
Each reply is under 70 words. Put your reason in the second line and keep the rest.
Capability.
Subject: Your RFQ for the 904L manifold, no quote from us Thank you for sending it. We will not quote this one: we do not machine 904L, and we would rather say so now than guess at the price. If you have 316L or 17-4 PH parts in the same size range, we would be glad to see them.
Certificate.
Subject: Your RFQ for the 316L housing, no quote from us Thank you for the drawing. The RFQ asks for ISO 13485 certification, which we do not hold, so we cannot quote it. We run 316L and 303 parts with heat-numbered material certificates. Send non-medical work and we will quote within 24 business hours.
Schedule.
Subject: Your RFQ for 200 shafts, no quote from us Thank you for the request. We cannot make the delivery date in the RFQ with our current load, so we will not quote. If the date moves to the week of 17 November, tell us and we will price it. We would also be glad to quote future work.
Swap in your own dates and grades. Say only what is true. A line like “we would be glad to quote future work” is only worth including if you mean it.
Need a quote for this part? Get a quote for your stainless parts
What to leave out
- A generic refusal. The no-bid guide advises against generic wording and asks for a brief, specific reason instead.
- A long explanation. Oversharing internal details reads as defensive. One reason is enough.
- A rough price. A figure given as a courtesy often becomes the number the buyer holds you to. If you decline, do not quote.
- Criticism of the drawing. If the part is poorly designed, say it in a question with a suggestion, not in a rejection.
- A forward of the drawing. The NDA guide covers why a drawing is the buyer’s to share. Ask permission first.
- A promise you will not keep. “We will be in touch next quarter” is a promise.
Referring a buyer on
A referral helps when you know the other shop and it agrees. Offer to name a shop or a type of shop, and let the buyer choose. For any RFQ, remember that the buyer may already be in contact with other shops, so a short no, sent quickly, is usually all that is needed.
Keep a log of your no-quotes
Add a column to your quote log: the reason code for each no-quote. After a quarter you will see which reasons repeat. If one grade or one certificate keeps appearing, that tells you whether to add the capability or stop paying for leads that need it. The lead worth guide shows how to work out what a lead is worth to you, and a log of declined leads is part of that arithmetic.
If stainless work is regular business for you, apply as a partner shop. Our work requests show the grade, finish, tolerance and certificates up front, so you can decline the ones that do not fit. We reply within 24 business hours.
Sources
- Iris, how to write a no-bid letter that protects future opportunities, RFP guidance, directional: timing, structure, what to avoid
- The Core Solution, ISO 9001:2015 clause 8.2.3 explained, consultancy summary, directional: review of requirements before commitment
- Wikipedia, International Traffic in Arms Regulations
- Wikimedia Commons, NOIRLab HQ Machine Shop, image source
Export rules and contract terms differ by customer and country. Confirm the position with your own adviser before declining or accepting controlled work.
Frequently asked questions
Should a shop reply to an RFQ it will not quote?
Yes, and quickly. A buyer who hears nothing cannot tell a busy shop from one that is not interested, and has to keep waiting or move on without you. A two-line reply with one honest reason costs a minute and keeps your name in the buyer's list for the next job that fits.
What reason should I give for declining an RFQ?
Give the true one, stated plainly and briefly. Good reasons are a grade or size outside your equipment, a tolerance you cannot inspect, a certificate you do not hold, a finish you do not offer or a date you cannot meet. Avoid long explanations and avoid stock lines such as 'unable to participate at this time'.
Can I refer the buyer to another shop?
Only if you know the other shop and it agrees. Do not forward the buyer's drawing, because it may be covered by an NDA or by export rules. Name the shop or the type of shop that fits and let the buyer make contact, or ask the buyer for permission to pass the drawing on.
How quickly should a no-quote reply go out?
As soon as you make the decision, ideally the same business day. Buyers work to schedules, and early notice lets them look elsewhere in time. If the decision needs a check with the floor or a subcontractor, send a short acknowledgement first and give a time for the answer.
Need a quote for this part?
Send the drawing. We read it, send one itemised quote within 24 business hours and place the work with a partner shop that cuts stainless.
Get a quote for your stainless partsFigures in this guide are published specification limits or published typical values for the alloy, not measurements of any part. Machinability is rated against free-machining carbon steel B1112 at 100 and PREN is chromium plus 3.3 times molybdenum plus 16 times nitrogen. The conventions are set out in thereference section and the editorial standards.